(a)
-
(1) The Commission on Water Well Construction shall issue rig permits if the water well contractor has:
-
(A) A valid license;
-
(B) Made proper application for a rig permit; and
-
(C) Paid the required fee.
-
-
(2) Rig permits shall not be transferable and shall expire July 31 of each year.
-
-
(b)
-
(1)
-
(A) The water well contractor must renew the rig permit annually by applying no later than thirty (30) days after the expiration date and paying the required fee.
-
(B) After receiving the renewal materials and fee, the commission shall extend the validity of the current rig permit until the water well contractor receives:
-
(i) The new rig permit; or
-
(ii) Notice that the commission has refused to renew the rig permit.
-
-
-
(2) After August 31 of each year, the commission shall only renew a rig permit upon application and payment of the applicable fee plus a penalty of twenty-five dollars ($25.00).
-
-
(c)
-
(1) No water well contractor shall operate a rig or permit an employee to operate a rig unless the water well contractor holds a valid rig permit issued by the commission.
-
(2) The water well contractor shall obtain a separate permit for each rig operated by the water well contractor during the permit year.
-
-
(d)
-
(1) The commission shall issue permits composed of weatherproof material.
-
(2) The water well contractor shall firmly and conspicuously attach the permit to the rig for which it was issued.
-