The board of supervisors shall retain fifteen percent (15%) of the amount due the engineer employed upon a percentage basis until the road constructed under his supervision shall have been finally accepted.
The board of supervisors shall retain fifteen percent (15%) of the amount due the engineer employed upon a percentage basis until the road constructed under his supervision shall have been finally accepted.