Executive Order No. 29-10 (No. 73-83) [Transfer of Land in Town of Marshfield From Agency of Environmental Conservation, Fish and Game Department, to Agency of Transportation]
WHEREAS, it appears that for State Highway purposes in connection with Highway Project Marshfield BRZ 1446 (10), it is necessary to acquire a certain piece of land located in the Town of Marshfield, County of Washington, and State of Vermont and presently under the jurisdiction and control of the Agency of Environmental Conservation, Fish and Game Department;
WHEREAS, the State Transportation Board is charged with and has the responsibility for planning, constructing, and maintaining all such highways;
NOW THEREFORE, I, Richard A. Snelling, by virtue of the powers vested in me as Governor of Vermont, do hereby transfer and set over from the Agency of Environmental Conservation, Fish and Game Department, to the jurisdiction and control of the Agency of Transportation for highway purposes the following described land, to wit:
Being part of the same land and premises conveyed to the Agency of Environmental Conservation, Fish and Game Department by Norman C. Dix and Sally M. Dix by Warranty Deed dated June 21, 1976 and recorded in Book 31, Page 307 of the Town of Marshfield Land Records, and being more particularly described as follows:
Being Parcel #2 consisting of 0.24 acre, more or less, land and rights therein, as shown on page 4 of the plans of Highway Project Marshfield BRZ 1446 (10) as filed on the 8th day of March, 1983, in the office of the Clerk of the Town of Marshfield.
In connection with the above parcel the following easements and/or rights are conveyed:
A temporary easement during the period of construction to enter upon land of the Grantor herein, for construction purposes, including the right to cut and dispose of all trees, down timber, stubs, brush, bushes, and debris, in an area which contains 0.11 acre, more or less, and is located left of and between approximate survey stations 20 + 82 of the established centerline and 23 + 23 of the revised centerline of said Highway Project.
An easement in an area of 0.01 acre, more or less, to change and maintain, if necessary, the channel of a certain stream of water known locally as Winooski River now running on lands of the Agency of Environmental Conservation, Fish and Game Department, left of and between approximate survey stations 21 + 13 and 21 + 35 of the established centerline of said Highway Project.
An easement to construct and maintain a drainage ditch located between approximate survey stations 21 + 19 and 21 + 39 of the established centerline of said Highway Project and thereby the right to discharge water through said drainage ditch onto the lands of the Agency of Environmental Conservation, Fish and Game Department.
A temporary easement during the period of construction to enter upon land of the Grantor herein to construct a drive between a point left of approximate survey station 21 + 32 of the established centerline and a point left of approximate survey station 23 + 05 of the revised centerline of said Highway Project.
An easement to extend highway slopes and embankments in a total area of 0.02 acre, more or less, as shown on page 4 of the plans of said Highway Project.
The slopes and embankments may be extended at such an angle as will hold the material of said slopes in repose against ordinary erosion in accordance with the standard practice of highway construction. The State of Vermont shall have the right to remove all trees, logs, stumps, protruding roots, brush, duff and other objectionable materials, structures, growth and any other thing of whatever kind or nature from said slope areas.
Dated June 10, 1983.