(a) The commissioner shall, in accordance with AS 44.62 (Administrative Procedure Act), specify the various rivers, lakes, and streams or parts of them that are important for the spawning, rearing, or migration of anadromous fish. (b) If a person or governmental agency desires to construct a hydraulic project, or use, divert, obstruct, pollute, or change […]
If a person or governmental agency begins construction on a work or project or use for which notice is required by AS 16.05.871 without first providing plans and specifications subject to the approval of the commissioner for the proper protection of fish and game, and without first having obtained written approval of the commissioner as […]
In an emergency arising from weather or stream flow conditions, the commissioner, through authorized representatives, shall issue oral permits to a riparian owner for removing obstructions or for repairing existing structures without the necessity of submitting prepared plans and specifications as required by AS 16.05.871.
If a person or governmental agency fails to notify the commissioner of any construction or use that causes material damage to the spawning beds or prevents or interferes with the migration of anadromous fish, or by neglect or noncompliance with plans and specifications required and approved by the commissioner causes material damage to the spawning […]
(a) A person who violates AS 16.05.871 – 16.05.896 is guilty of a class A misdemeanor. (b) The court shall transmit the proceeds of all fines to the proper state officer for deposit in the general fund of the state.