25200. (a) The department shall issue a hazardous waste facilities permit to use and operate one or more hazardous waste management units at a hazardous waste facility that, in the judgment of the department, meet the building standards published in the State Building Standards Code relating to hazardous waste facilities and the other standards and requirements […]
25200.05. (a) No later than 90 days after receiving an application for a hazardous waste facilities permit pursuant to Section 25200 or 25201.6, the department shall post on its internet website a timeline with the estimated dates of key milestones in the hazardous waste facilities permit application review process, which shall include, but are not limited […]
25200.1. Notwithstanding Section 25200, the department shall not issue a hazardous waste facility permit to a facility which commences operation on or after January 1, 1987, unless the department determines that the facility operator is in compliance with regulations adopted by the department pursuant to this chapter requiring that the operator provide financial assurance that […]
25200.1.5. (a) The department may establish an administrative process to certify hazardous waste environmental technologies that it determines will not pose a significant potential hazard to human health and safety or to the environment if they are used under specified operating conditions. Hazardous waste environmental technologies which may be certified shall include, but are not […]
25200.10. (a) For purposes of this section, “facility” means the entire site that is under the control of the owner or operator seeking a hazardous waste facilities permit. (b) Except as provided in subdivisions (d) and (e), the department, or a unified program agency approved to implement this section pursuant to Section 25404.1, shall require, […]
25200.11. (a) On or before July 1, 1993, the department shall take final action on each application for a hazardous waste facilities permit to be issued pursuant to Section 25200 for an offsite hazardous waste facility which is not subject to the time limits specified in Section 25200.7 and which has been operating under a […]
25200.12. A modification to an offsite facility operating under interim status pursuant to Section 25200.5 that requires a revised Part A application pursuant to Article 4 (commencing with Section 66270.40) of Chapter 20 of Division 4.5 of Title 22 of the California Code of Regulations, as that article read on January 1, 1992, is a […]
25200.13. For purposes of Sections 25200.11 and 25200.12, “offsite facility” means a facility that serves more than one generator of hazardous waste. (Added by Stats. 1991, Ch. 719, Sec. 5.)
25200.14. (a) For purposes of this section, “phase I environmental assessment” means a preliminary site assessment based on reasonably available knowledge of the facility, including, but not limited to, historical use of the property, prior releases, visual and other surveys, records, consultant reports, and regulatory agency correspondence. (b) (1) Except as provided in paragraph (2) and in subdivision […]
25200.14.1. (a) On or before July 1, 1997, the department shall complete an evaluation of the phase I environmental assessment requirement specified by Section 25200.14, and identify any necessary and appropriate changes to that requirement. (b) In evaluating the phase I environmental assessment requirement, the department shall, at a minimum, consider the following issues: (1) […]
25200.15. (a) The owner or operator of a facility that has a hazardous waste facilities permit issued pursuant to Section 25200 or 25201.6 may change facility structures or equipment without modifying the facility’s hazardous waste facilities permit, if either of the following apply: (1) The change to structures or equipment is not within a permitted unit. (2) Both […]
25200.16. (a) The department may administratively convert the hazardous waste facilities permit or grant of interim status of a hazardous waste management unit authorized pursuant to such a permit or grant of interim status to authorization to operate under a permit-by-rule, pursuant to the department’s regulations, a grant of conditional authorization or conditional exemption pursuant […]
25200.17. (a) Upon petition, the department may, by regulation, add new treatment activities to the list of activities eligible for operation pursuant to a permit-by-rule, under the regulations adopted by the department, or eligible for authorization under a grant of conditional authorization pursuant to Section 25200.3 or a grant of conditional exemption pursuant to Section […]
25200.19. (a) A hazardous waste facility that obtains a hazardous waste facilities permit to receive hazardous wastes from offsite locations may conduct bulk, packaged, or containerized hazardous waste unloading operations in accordance with the requirements of this section, except to the extent that the facility is subject to conditions and limitations in the permit concerning […]
25200.2. (a) The department shall develop a permitting process for transportable hazardous waste treatment units for treating hazardous waste in accordance with the federal act and in accordance with this chapter for hazardous wastes that are not otherwise subject to the federal act. The permitting process shall require the units to be permitted pursuant to the […]
25200.21. On or before January 1, 2018, the department shall adopt regulations establishing or updating criteria used for the issuance of a new or modified permit or renewal of a permit, which may include criteria for the denial or suspension of a permit. In addition to any other criteria the department may establish or update […]
25200.23. On or before July 1, 2018, the department shall develop and implement programmatic reforms designed to improve the protectiveness, timeliness, legal defensibility, and enforceability of the department’s permitting program, including strengthening environmental justice safeguards, enhancing enforcement of public health protections, and increasing public participation and outreach activities. In accomplishing these reforms, the department shall […]
25200.25. (a) If a final hazardous waste facilities permit decision has not been issued by the department by the applicable hazardous waste facilities permit decision deadline pursuant to Section 25200 or 25201.6, the department shall issue a report, which shall be released to the public, that includes the reasons why the final hazardous waste facilities permit […]
25200.27. (a) After the issuance of a report required pursuant to subdivision (a) of Section 25200.25, the department shall do all of the following: (1) Request that the board schedule a hearing for the department to present the report. (2) Present to the board a proposed schedule for issuing the final hazardous waste facilities permit decision. (3) Provide an […]
25200.3. (a) A generator who uses the following methods for treating RCRA or non-RCRA hazardous waste in tanks or containers, which is generated onsite, and which do not require a hazardous waste facilities permit under the federal act, shall, for those activities, be deemed to be operating pursuant to a grant of conditional authorization without obtaining […]