Section 22161.
22161. For purposes of this chapter, the following definitions apply: (a) “Best value” means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting […]
Section 22162.
22162. (a) Except as provided in subdivision (b), and notwithstanding any other law, a local agency, with approval of its governing body, may procure design-build contracts for public works projects in excess of one million dollars ($1,000,000), awarding the contract either the low bid or the best value, provided that this article shall not apply to […]
Section 22162.4.
22162.4. Upon approval of its governing body, a city, county, or city and county may use the design-build contracting process described in this chapter to award contracts for construction of projects that are necessary in order to comply with construction-related accessibility standards, as defined in Section 65946 of the Government Code. (Added by Stats. 2022, […]
Section 22162.5.
22162.5. Upon approval by its governing body, the Santa Clara Valley Water District may use the design-build contracting process described in this chapter to award a contract for the following projects: (a) Flood protection improvements. (b) Habitat restorations or enhancements. (c) Groundwater recharge or storage facilities. (d) Water treatment facilities. (e) The retrofit, repair, or expansion of existing surface water […]
Section 22104.
22104. (a) Contract awards shall be based on the proposal which provides the most cost-effective solution to the district’s requirements, as determined by the evaluation criteria contained in the solicitation document. The evaluation procedures may provide for the selection of a vendor on a basis other than cost alone. (b) Evaluation of proposals for the purpose of […]
Section 22162.6.
22162.6. (a) Upon approval of the board of supervisors, the County of Orange may use the design-build contracting process described in this chapter to award a contract for the following projects: (1) Flood protection improvements. (2) Harbor and beach improvements. (3) Bikeway improvements. (b) In addition to the requirements set forth in Section 22164, for a project authorized under subdivision […]
Section 22105.
22105. Protest procedures shall be provided to allow proposers an opportunity to formally protest any acquisition conducted in accordance with this chapter. Authority to protest may be limited to participating proposers. The procuring officer of the district, or the person designated by the procuring officer, is authorized to consider and decide on initial protests. A […]
Section 22162.7.
22162.7. (a) Upon approval of the governing body, the Orange County Flood Control District, as defined in Chapter 36 of the Orange County Flood Control Act, Sections 1 to 23 of the Orange County Flood Control Act, Water Code Appendix, may use the design-build contracting process described in this chapter to award a contract for flood […]
Section 22106.
22106. Electronic data-processing goods which are determined to be surplus to the district’s needs shall be disposed of in a manner best serving the interests of the district, which may include auction, sale, or transfer to other governmental entities. (Added by Stats. 1983, Ch. 586, Sec. 1.)
Section 22162.8.
22162.8. (a) Upon approval of its governing body, the Paradise Irrigation District may use the design-build contracting process described in this chapter to award a contract for a water conveyance pipeline from the Town of Paradise to the City of Chico. (b) Upon approval of a majority of the Paradise Town Council, the Town of Paradise may […]