Section 22162.5.

22162.5. Upon approval by its governing body, the Santa Clara Valley Water District may use the design-build contracting process described in this chapter to award a contract for the following projects: (a) Flood protection improvements. (b) Habitat restorations or enhancements. (c) Groundwater recharge or storage facilities. (d) Water treatment facilities. (e) The retrofit, repair, or expansion of existing surface water […]

Section 22162.6.

22162.6. (a) Upon approval of the board of supervisors, the County of Orange may use the design-build contracting process described in this chapter to award a contract for the following projects: (1) Flood protection improvements. (2) Harbor and beach improvements. (3) Bikeway improvements. (b) In addition to the requirements set forth in Section 22164, for a project authorized under subdivision […]

Section 22162.7.

22162.7. (a) Upon approval of the governing body, the Orange County Flood Control District, as defined in Chapter 36 of the Orange County Flood Control Act, Sections 1 to 23 of the Orange County Flood Control Act, Water Code Appendix, may use the design-build contracting process described in this chapter to award a contract for flood […]

Section 22162.8.

22162.8. (a) Upon approval of its governing body, the Paradise Irrigation District may use the design-build contracting process described in this chapter to award a contract for a water conveyance pipeline from the Town of Paradise to the City of Chico. (b) Upon approval of a majority of the Paradise Town Council, the Town of Paradise may […]

Section 22162.9.

22162.9. (a) Upon approval of the city council of the City of Long Beach, the City of Long Beach may use the design-build contracting process described in this chapter to award contracts for curb ramps that are compliant with the Americans with Disabilities Act. (b) In addition to the requirements set forth in Section 22164, for a […]