§ 25-9-4. Design Locate Request and Response

Any person may submit a design locate request to the UPC. Such design locate request shall: Describe the tract or parcel of land for which the design locate request has been submitted with sufficient particularity, as defined by policies developed and promulgated by the UPC, to enable the facility owner or operator to ascertain the […]

§ 25-9-6. Prerequisites to Blasting or Excavating; Marking of Sites

No person shall commence, perform, or engage in blasting or in excavating with mechanized excavating equipment on any tract or parcel of land in any county in this state unless and until the person planning the blasting or excavating has submitted a locate request to the UPC that provides appropriate notice. Any person performing excavation […]

§ 25-9-7. Determining Whether Underground Facilities Are Present; Information to Upc; Noncompliance; Future Underground Facilities; Abandoned Underground Facilities

Prior to 7:00 A.M. on the effective date, each facility owner or operator shall determine whether or not underground facilities are located on the tract or parcel of land upon which the blasting or excavating is to occur. If underground facilities are determined to be present, the facility owner or operator shall designate, through stakes, […]

§ 25-9-9. Degree of Accuracy Required in Underground Facility Location Information; Effect of Inaccurate Information on Liability of Blaster or Excavator; Liability of Facility Owners for Losses Resulting From Lack of Accurate Information

For the purposes of this chapter, the location of underground facilities provided by a facility owner or operator in accordance with subsection (a) of Code Section 25-9-7 to any person engaging in scheduled blasting and excavating shall be accurate to within 18 inches, measured horizontally from the outer edge of either side of such underground […]

§ 25-9-10.1. Cooperation With the Department of Transportation

On and after July 1, 2023, the Department of Transportation shall participate in and cooperate with the UPC for purposes of receiving locate requests in the Department of Transportation’s right of way for underground facilities following a process consistent with Code Sections 25-9-6, 25-9-7, and 25-9-8 and subsection (a) of Code Section 25-9-9. The Department […]

§ 25-8-9. Promulgation of Rules and Regulations by Commissioner; Forms

The Commissioner may promulgate such rules and regulations, neither inconsistent nor contradictory with this chapter, as he deems necessary to effectuate this chapter. The Commissioner may also prescribe the forms required for the administration of this chapter. History. Ga. L. 1978, p. 1624, § 9.