US Lawyer Database

13-22-12-10. Annual Operation Fees; Requirement Under Certain Circumstances

Sec. 10. Regardless of a person’s rate of generation, a person must pay a generator annual operation fee if the person accumulates more than: (1) six thousand (6,000) kilograms of hazardous waste; or (2) one (1) kilogram of acutely toxic waste; onsite at any time during a year. [Pre-1996 Recodification Citation: 13-7-16.1-3(n).] As added by […]

13-22-12-11. Groundwater Compliance Sampling Fees

Sec. 11. Groundwater compliance sampling fees established under this chapter apply to groundwater monitoring wells in existence at an operating land disposal facility at the time an annual operation fee concerning the land disposal facility is assessed. [Pre-1996 Recodification Citation: 13-7-16.1-3(o).] As added by P.L.1-1996, SEC.12.

13-22-12-13. Payment and Deposit of Fees and Delinquency Charges

Sec. 13. Except for the hazardous waste disposal fee collected under section 3.5 of this chapter, the fees and delinquency charges collected under this chapter: (1) are payable to the department; and (2) shall be deposited in the environmental management permit operation fund established by IC 13-15-11-1. [Pre-1996 Recodification Citation: 13-7-16.1-3(q).] As added by P.L.1-1996, […]

13-22-13-1. Order; Civil Action by Commissioner

Sec. 1. If, on the basis of any information, the commissioner determines that there is or has been a release of a hazardous waste or a constituent of a hazardous waste into the environment from a facility authorized to operate under interim status under Section 3005(e) of the federal Solid Waste Disposal Act (42 U.S.C. […]

13-22-13-2. Restrictions on Corrective Action

Sec. 2. Under section 1 of this chapter, the commissioner or a court may order the performance of corrective action beyond the boundaries of the facility from which the release occurs. However, the commissioner may not order corrective action beyond the boundaries of the facility if the owner or operator of the facility demonstrates to […]

13-22-13-3. Contents of Order

Sec. 3. An order issued by the commissioner under this chapter: (1) must state with reasonable specificity the nature of the corrective action or other response measure required by the order; (2) must specify a time for compliance; and (3) may include a suspension or revocation of authorization for the facility to operate under interim […]

13-22-12-3.5. Fees for Disposal of Hazardous Waste

Sec. 3.5. (a) For the disposal of hazardous waste in Indiana, the fees are as follows: (1) For hazardous waste disposed of in a disposal facility, eleven dollars and fifty cents ($11.50) per ton. If hazardous waste is mixed with or dissolved or suspended in water or another liquid at the time it is disposed […]

13-22-14-1. Enforcement Under Ic 13-30-3

Sec. 1. IC 13-22-2 through IC 13-22-8 and IC 13-22-13 shall be enforced under IC 13-30-3. [Pre-1996 Recodification Citation: 13-7-8.5-8(a).] As added by P.L.1-1996, SEC.12.