13-26-11-12. Notice
Sec. 12. After introduction of the ordinance initially fixing rates or charges but before the ordinance is finally adopted, notice of the hearing setting forth the proposed schedule of the rates or charges must be given by publication one (1) time each week for two (2) weeks: (1) with each publication of notice in a […]
13-26-11-13. Ordinance Establishing Rates and Charges; Schedule; Notice; Objections; Hearing; Appeal
Sec. 13. (a) The ordinance establishing the initial rates or charges, either as: (1) originally introduced; or (2) modified and amended; shall be passed and put into effect after the hearing. (b) A copy of the schedule of the rates and charges established must be: (1) kept on file in the office of the district; […]
13-26-11-14. Extension of Rates and Charges to Cover Additional Premises; Changes or Readjustments
Sec. 14. (a) The rates or charges established for a class of users of property served shall be extended to cover any additional premises served after the rates or charges are established that are in the same class, without the necessity of hearing or notice. (b) Subject to section 15 of this chapter, a change […]
13-26-11-15. Regional Sewage District Authority; Membership; Notice of Rate Increase; Objecting Petition; Public Hearing; Order and Appeal
Sec. 15. (a) A district authority is established in each regional sewage district established under this article. A district authority: (1) must consist of an odd number of members; (2) must consist of at least three (3) members; and (3) may not include as a member any person who serves on the board of trustees […]
13-26-11-2. Sewage Works; Campgrounds; Youth Camps
Sec. 2. (a) Except as provided in subsection (b), the rates or charges for a sewage works may be determined based on a combination of the following factors: (1) A flat charge for each connection. If a board uses a flat charge as a factor to determine a rate or charge for a sewage works, […]
13-26-11-1. Waterworks
Sec. 1. The rates and charges for a waterworks may be determined based on the following: (1) A flat charge for each connection. (2) The amount of water consumed. (3) The size of the meter or connection. (4) Whether the property served has been or will be required to pay separately for the cost of […]