US Lawyer Database

13-26-11-12. Notice

Sec. 12. After introduction of the ordinance initially fixing rates or charges but before the ordinance is finally adopted, notice of the hearing setting forth the proposed schedule of the rates or charges must be given by publication one (1) time each week for two (2) weeks: (1) with each publication of notice in a […]

13-26-11-2. Sewage Works; Campgrounds; Youth Camps

Sec. 2. (a) Except as provided in subsection (b), the rates or charges for a sewage works may be determined based on a combination of the following factors: (1) A flat charge for each connection. If a board uses a flat charge as a factor to determine a rate or charge for a sewage works, […]

13-26-11-1. Waterworks

Sec. 1. The rates and charges for a waterworks may be determined based on the following: (1) A flat charge for each connection. (2) The amount of water consumed. (3) The size of the meter or connection. (4) Whether the property served has been or will be required to pay separately for the cost of […]