US Lawyer Database

For Lawyer-Seekers

YOU DESERVE THE BEST LAWYER

22-11-21-1. Application

Sec. 1. This chapter applies only to a Class 1 or Class 2 structure for which a building permit is issued by a city, town, or county after June 30, 2018. As added by P.L.104-2018, SEC.1.

22-11-21-1. Application

Sec. 1. This chapter applies only to a Class 1 or Class 2 structure for which a building permit is issued by a city, town, or county after June 30, 2018. As added by P.L.104-2018, SEC.1.

22-11-21-10. Electronic Notification of Use of Advanced Structural Components

Sec. 10. Not later than ninety (90) days after issuing the building permit, the city, town, or county building commissioner shall send electronic notification, read receipt requested, of a structure’s use of advanced structural components to the: (1) local fire department; and (2) 911 telephone call center; responsible for the area where the structure is […]

22-11-21-10. Electronic Notification of Use of Advanced Structural Components

Sec. 10. Not later than ninety (90) days after issuing the building permit, the city, town, or county building commissioner shall send electronic notification, read receipt requested, of a structure’s use of advanced structural components to the: (1) local fire department; and (2) 911 telephone call center; responsible for the area where the structure is […]

22-11-21-11. 911 Telephone Call Center Duties Concerning Qualifying Property Information

Sec. 11. Upon receiving a notification described under section 10 of this chapter, the receiving 911 telephone call center shall: (1) maintain the information contained in the notification for the qualifying property; and (2) relay the information contained in a qualifying property’s notification to all responding public safety units whenever dispatching public safety units to […]

22-11-21-11. 911 Telephone Call Center Duties Concerning Qualifying Property Information

Sec. 11. Upon receiving a notification described under section 10 of this chapter, the receiving 911 telephone call center shall: (1) maintain the information contained in the notification for the qualifying property; and (2) relay the information contained in a qualifying property’s notification to all responding public safety units whenever dispatching public safety units to […]

22-11-21-2. “Advanced Structural Components”

Sec. 2. As used in this chapter, “advanced structural components” means lightweight I-joists or lightweight roof trusses that: (1) have less mass cross-sectional area than sawn lumber of equivalent proportions used in an equivalent application; and (2) are assembled from combustible or noncombustible materials, or both. The term does not include a structural assembly, joist, […]

22-11-21-2. “Advanced Structural Components”

Sec. 2. As used in this chapter, “advanced structural components” means lightweight I-joists or lightweight roof trusses that: (1) have less mass cross-sectional area than sawn lumber of equivalent proportions used in an equivalent application; and (2) are assembled from combustible or noncombustible materials, or both. The term does not include a structural assembly, joist, […]

22-11-21-3. “Astm”

Sec. 3. As used in this chapter, “ASTM” refers to the American Society for Testing and Materials. As added by P.L.104-2018, SEC.1.

22-11-21-3. “Astm”

Sec. 3. As used in this chapter, “ASTM” refers to the American Society for Testing and Materials. As added by P.L.104-2018, SEC.1.

22-11-21-6. “Fire Department”

Sec. 6. As used in this chapter, “fire department” has the meaning set forth in IC 22-12-1-12. As added by P.L.104-2018, SEC.1.

22-11-21-6. “Fire Department”

Sec. 6. As used in this chapter, “fire department” has the meaning set forth in IC 22-12-1-12. As added by P.L.104-2018, SEC.1.

22-11-21-8. “Structure”

Sec. 8. As used in this chapter, “structure” means a Class 1 or Class 2 structure. As added by P.L.104-2018, SEC.1.

22-11-21-8. “Structure”

Sec. 8. As used in this chapter, “structure” means a Class 1 or Class 2 structure. As added by P.L.104-2018, SEC.1.