36-1-12-20. Trench Safety Systems; Cost Recovery

Sec. 20. (a) This section applies to a public works project that may require creation of a trench of at least five (5) feet in depth. (b) IOSHA regulations 29 C.F.R. 1926, Subpart P, for trench safety systems shall be incorporated into the contract documents for a public works project. (c) The contract documents for […]

36-1-12-21. Plumbing Installations; Proof of Licensure

Sec. 21. (a) A person who submits a bid for a public works contract under this chapter that involves the installation of plumbing must submit evidence that the person is a licensed plumbing contractor under IC 25-28.5-1. (b) If a public works contract under this chapter is awarded to a person who does not meet […]

36-1-12-22. Repealed

As added by P.L.172-2011, SEC.142. Repealed by P.L.17-2012, SEC.5; P.L.67-2012, SEC.5.

36-1-12-23. Application of Ic 5-22-16.5 to Award of Contracts Under Article

Sec. 23. (a) IC 5-22-16.5 (Disqualification of Contractors Dealing with the Government of Iran) applies to the awarding of contracts, including contracts for professional services, under this chapter. (b) For purposes of applying IC 5-22-16.5 to contracts awarded under this chapter, the following apply: (1) A reference to an “offer” in IC 5-22-16.5 refers to: […]

36-1-12-3. Public Work Projects

Sec. 3. (a) The board may purchase or lease materials in the manner provided in IC 5-22 and perform any public work, by means of its own workforce, without awarding a contract whenever the cost of that public work project is estimated to be less than two hundred fifty thousand dollars ($250,000). Before a board […]

36-1-12-4. Bidding Procedures for Projects Costing More Than Certain Amounts

Sec. 4. (a) This section applies whenever the cost of a public work project will be at least one hundred fifty thousand dollars ($150,000). (b) The board must comply with the following procedure: (1) The board shall prepare general plans and specifications describing the kind of public work required, but shall avoid specifications which might […]

36-1-12-4.5. Bond or Certified Check; Filing by Bidders

Sec. 4.5. (a) The political subdivision or agency: (1) shall require a bond or a certified check to be filed with each bid by a bidder in the amount determined and specified by the board in the notice of the letting if the cost of the public work is estimated to be more than two […]

36-1-12-4.7. Procedures for Inviting Quotes; Applicable Dollar Amounts

Sec. 4.7. (a) This section applies whenever a public work project is estimated to cost at least fifty thousand dollars ($50,000) and less than one hundred fifty thousand dollars ($150,000). (b) The board must proceed under the following provisions: (1) The board shall invite quotes from at least three (3) persons known to deal in […]

36-1-12-4.9. Alternate Procedures for Projects Costing Less Than $150,000

Sec. 4.9. (a) This section applies to a public work for the routine operation, routine repair, or routine maintenance of existing structures, buildings, or real property if the cost of the public work is estimated to be less than one hundred fifty thousand dollars ($150,000). (b) The board may award a contract for public work […]

36-1-12-5. Procedures for Inviting Quotes; Applicable Dollar Amount

Sec. 5. (a) This section applies whenever a public work project is estimated to cost less than fifty thousand dollars ($50,000). Except as provided in subsection (g) for local boards of aviation commissioners and local airport authorities, if a contract is to be awarded, the board may proceed under section 4 of this chapter or […]

36-1-12-9. Emergencies; Contracts by Invitation

Sec. 9. (a) The board, upon a declaration of emergency, may contract for a public work project without advertising for bids if bids or quotes are invited from at least two (2) persons known to deal in the public work required to be done. (b) The minutes of the board must show the declaration of […]