36-9-40-10. Special Assessment Levy; Limitation on Amount

Sec. 10. (a) The works board shall levy special assessments for the amount determined under section 9 of this chapter if: (1) the contract for construction of the system is executed; and (2) the system is constructed. (b) The special assessments levied under this section may not exceed the cost of construction of the system. […]

36-9-40-13. Construction Contract for Entire System; Challenge to Contract

Sec. 13. (a) The contract for construction of a system must be for construction of the entire system. (b) After the execution of a contract for construction of a system, the validity of the contract may be questioned only in an action to enjoin the performance of the contract. This action must be brought before […]

36-9-40-14. Contractor Guarantee of Workmanship and Materials

Sec. 14. (a) A contractor for construction of a system must guarantee the contractor’s workmanship and all materials used in the work. (b) The guarantee required under subsection (a) must be in the following form: “The contractor warrants the contractor’s workmanship and all materials used in the work and agrees that during the guarantee period […]

36-9-40-15. County and Contractor Responsibilities for System Repairs

Sec. 15. (a) If repairs to a system become necessary, the county must give written notice to the contractor to make the repairs. If the contractor fails to begin the repairs not later than thirty (30) days after the notice is received, the county may do the following: (1) Make the repairs using the county’s […]

36-9-40-3. Installation

Sec. 3. A county may install private sewage disposal systems under this chapter. As added by P.L.7-2002, SEC.1.