US Lawyer Database

For Lawyer-Seekers

YOU DESERVE THE BEST LAWYER

Home » US Law » 2022 Iowa Code » Title XI - NATURAL RESOURCES » Chapter 468 - LEVEE AND DRAINAGE DISTRICTS AND IMPROVEMENTS

Section 468.1 – Jurisdiction to establish.

468.1 Jurisdiction to establish. The board of supervisors of any county shall have jurisdiction, power, and authority at any regular, special, or adjourned session, to establish a drainage district or districts, and to locate and establish levees, and cause to be constructed as hereinafter provided any levee, ditch, drain, or watercourse, or settling basins in […]

Section 468.10 – Engineer.

468.10 Engineer. 1. The board shall at its first session thereafter, regular, special, or adjourned, examine the petition and if it be found sufficient in form and substance, shall appoint a disinterested and competent civil engineer who shall give bond to the county for the use of the proposed levee or drainage district, if it […]

Section 468.100 – Monthly estimate — payment.

468.100 Monthly estimate — payment. 1. The supervising engineer shall, on or before the tenth day of each calendar month, furnish the contractor and file with the auditor estimates for work done during the preceding calendar month under the contract on each section, and the auditor shall at once draw warrants in favor of such […]

Section 468.101 – Completion of work — report — notice.

468.101 Completion of work — report — notice. When the work to be done under a contract is completed to the satisfaction of the engineer in charge of construction, the engineer shall report and certify that the contract is completed to the board. Upon receipt of the report, the board shall set a day to […]

Section 468.102 – Objections.

468.102 Objections. Any party interested in the said district or the improvement thereof may file objections to said report and submit any evidence tending to show said report should not be accepted. Any interested party having a claim for damages arising out of the construction of the improvement or repair shall file said claim with […]

Section 468.103 – Final settlement — claims for damages.

468.103 Final settlement — claims for damages. 1. If the board finds the work under any contract has been completed and accepted, the board shall compute the balance due, and if there are no liens on file against such balance, it shall enter of record an order directing the auditor to draw a warrant in […]

Section 468.104 – Abandonment of work.

468.104 Abandonment of work. In case any contractor abandons or fails to proceed diligently and properly with the work before completion, or in case the contractor fails to complete the same in the time and according to the terms of the contract, the board shall make written demand on the contractor and the contractor’s surety […]

Section 468.105 – New contract — suit on bond.

468.105 New contract — suit on bond. Unless the contractor or the surety on the contractor’s bond shall appear and in good faith proceed to comply with the demand, and resume work under the contract within the time fixed, the board shall proceed to let contracts for the unfinished work in the same manner as […]

Section 468.106 – Construction on or along highway.

468.106 Construction on or along highway. When a levee or drainage district shall have been established by the board and it shall become necessary or desirable that the levee, ditch, drain, or improvement shall be located and constructed within the limits of any public highway, it shall be so built as not materially to interfere […]

Section 468.107 – Establishment of highways.

468.107 Establishment of highways. The board shall have power to establish public highways along and upon any levee or embankment along any such ditch or drain, but when so established the same shall be worked and maintained as other highways and so as not to obstruct or impair the levee, ditch, or drain. [S13, §1989-a20; […]

Section 468.108 – Bridges.

468.108 Bridges. 1. When a levee, ditch, drain, or change of any natural watercourse crosses a public highway, necessitating moving or building or rebuilding any secondary road bridge upon or ditch or drain crossing the road, the board of supervisors shall move, build, or rebuild the bridge, ditch, or drain, paying the costs and expenses, […]

Section 468.109 – Construction across railroad.

468.109 Construction across railroad. Whenever the board of supervisors shall have established any levee, or drainage district, or change of any natural watercourse and the levee, ditch, drain, or watercourse as surveyed and located crosses the right-of-way of any railroad company, the county auditor shall immediately cause to be served upon such railroad company, in […]

Section 468.11 – Survey.

468.11 Survey. 1. The engineer shall examine the lands described in the petition and any other lands which would be benefited by said improvement or necessary in carrying out the purposes of the petition. 2. The engineer shall locate and survey such ditches, drains, levees, settling basins, pumping stations, and other improvements as will be […]

Section 468.110 – Duty to construct.

468.110 Duty to construct. Upon receiving the notice provided in section 468.109, such railroad company shall construct the improvement across its right-of-way according to the plans and specifications prepared by the engineer for said district, and build or rebuild the necessary culvert or bridge and complete the same within the time specified. [S13, §1989-a18; C24, […]

Section 468.111 – Bridges at natural waterway — costs.

468.111 Bridges at natural waterway — costs. The cost of building, rebuilding, constructing, reconstructing, changing, or repairing, as the case may be, any culvert or bridge, when such improvement is located at the place of the natural waterway or place provided by the railroad company for the flow of the water, shall be borne by […]

Section 468.112 – Construction when company refuses.

468.112 Construction when company refuses. If a railroad company does not comply with a notice provided in section 468.109, the board shall provide for the construction of the improvement under the supervision of the engineer in charge of the improvement. The railroad company shall be liable for the cost of the construction which shall be […]

Section 468.113 – Cost of construction across railway.

468.113 Cost of construction across railway. The cost of constructing the improvement across the right-of-way of such company, not including the cost of building or rebuilding and constructing or reconstructing any necessary culvert or bridge, when such improvement is located at the place of the natural waterway or place provided by the railroad company for […]

Section 468.114 – Passing drainage equipment across railway.

468.114 Passing drainage equipment across railway. It shall be the duty of any steam or electric railway company to furnish the contractor unrestricted passage across its right-of-way, telegraph, telephone, and signal lines for the contractor’s machines and equipment, whenever recommended by the engineer and approved by the board of supervisors, and the cost thereof shall […]

Section 468.115 – Passage across other public utilities.

468.115 Passage across other public utilities. The owner or operator of a public utility, whether operated publicly or privately other than steam and electric railways shall afford the contractor of any drainage project under this subchapter, parts 1 through 5, unrestricted passage for the contractor’s machines and equipment across the right-of-way lines or other equipment […]

Section 468.116 – Failure to comply.

468.116 Failure to comply. If the owner or operator of the utility fails to afford such passage within fifteen days after written notice from the drainage engineer so to do, the contractor, under the supervision of the engineer, may proceed to do the necessary work to afford such passage and to place said utility in […]