US Lawyer Database

Section 460.1317 – Zoning Review and Approval; Application; Approval or Denial Requirements; Fees; Moratorium Prohibited; Revocation.

460.1317 Zoning review and approval; application; approval or denial requirements; fees; moratorium prohibited; revocation. Sec. 17. (1) The activities set forth in section 15(5) are exempt from zoning review. Subsections (2) to (4) apply to zoning reviews for the following activities that are subject to zoning review and approval, that are not a permitted use […]

Section 460.1319 – Authority Poles; Exclusive Arrangement Prohibited; Limitation on Rates, Fees, and Terms; Elimination of Aboveground Poles.

460.1319 Authority poles; exclusive arrangement prohibited; limitation on rates, fees, and terms; elimination of aboveground poles. Sec. 19. (1) An authority shall not enter into an exclusive arrangement with any person for the right to attach to authority poles. A person who purchases, controls, or otherwise acquires an authority pole is subject to the requirements […]

Section 460.1321 – Municipally Owned Electric Utility; Collocation on Nonauthority Poles; Standards; Application Process; Moratorium Prohibited; Rates; Make-Ready Work.

460.1321 Municipally owned electric utility; collocation on nonauthority poles; standards; application process; moratorium prohibited; rates; make-ready work. Sec. 21. (1) The governing body of a municipally owned electric utility shall not enter into an exclusive arrangement with any person for the right to attach to nonauthority poles. (2) The governing body of a municipally owned […]

Section 460.1323 – Attaching Entity; Standards; Compliance; Rate; Civil Action.

460.1323 Attaching entity; standards; compliance; rate; civil action. Sec. 23. (1) An attaching entity, and all contractors or parties under its control, shall comply with reliability, safety, and engineering standards adopted by the governing body of a municipally owned electric utility, including, but not limited to, the following: (a) Applicable engineering and safety standards governing […]

Section 460.1325 – Jurisdiction; Authority; Certain Interior Structures, Campuses, Stadiums, and Athletic Facilities.

460.1325 Jurisdiction; authority; certain interior structures, campuses, stadiums, and athletic facilities. Sec. 25. An authority does not have jurisdiction or authority over the design, engineering, construction, installation, or operation of a small cell wireless facility located in an interior structure or upon a campus of an institution of higher education including any stadiums or athletic […]

Section 460.1327 – Circuit Courts; Jurisdiction; Right to Appeal.

460.1327 Circuit courts; jurisdiction; right to appeal. Sec. 27. The circuit court has jurisdiction to determine all disputes arising under this act. Venue lies in the judicial circuit where the authority or municipally owned electric utility is located. In addition to its right to appeal to the circuit court, an applicant may elect, at its […]

Section 460.1329 – Indemnification; Insurance Requirements.

460.1329 Indemnification; insurance requirements. Sec. 29. As part of the permit process under section 15, a zoning approval process under section 17, or a request process under section 21, an authority or the governing body of a municipally owned electric utility may require a wireless provider to do the following with respect to a small […]