18-113 – Judicial Review.
§ 18-113. Judicial review. 1. A judicial proceeding to review a final decision of the board shall be brought in the appellate division of the supreme court in the judicial department embracing the county wherein the facility is proposed to be located. Such proceeding shall be initiated by the filing of a petition in such […]
21-106 – Co-Generation, Small Hydro and Alternate Energy Production Facilities.
§ 21-106. Co-generation, small hydro and alternate energy production facilities. 1. For the purposes of this article: a. The term “co-generation facility” shall include any facility with an electric generating capacity of up to eighty megawatts, together with any related facilities located at the same project site, which is fueled by coal, gas, wood, alcohol, […]
18-111 – Action of the Board.
§ 18-111. Action of the board. 1. After being convened, the board shall commission such studies as it deems necessary, and shall hold a series of public hearings and meetings. Notice of such studies, hearings and meetings shall be published in the state register and in at least one newspaper of general circulation in the […]
17-101 – Definitions.
§ 17-101. Definitions. For the purpose of this article, the following terms shall have the following meanings: 1. “Residential structure” shall mean a one or two family dwelling or a single unit of a multiple dwelling, including an individual condominium unit or cooperative unit, which is offered for sale or rental on or after January […]
17-102 – Administration.
§ 17-102. Administration. Notwithstanding any other provision of law, the New York state energy research and development authority shall be deemed to have the responsibility and authority to implement the provisions of this article.
17-103 – Truth in Heating.
§ 17-103. Truth in heating. 1. (a) On or after January first, nineteen hundred eighty-one, the seller of a residential structure shall, within fifteen days of receipt of a written request from a prospective purchaser, furnish such purchaser a complete set of heating and/or cooling bills, or a summary of such heating and/or cooling bills, […]
17-105 – Heating System Efficiency Tests.
§ 17-105. Heating system efficiency tests. 1. For the purposes of this section: a. “Contractor” means any person who contracts to install, repair or service oil or gas heating systems for customers. b. “Oil heating system” means a device which burns either No. 2 or No. 4 fuel oil for heating purposes. c. “Gas heating […]
18-101 – Definitions.
§ 18-101. Definitions. As used in this article, unless the context otherwise requires: 1. “Commissioner” means the commissioner of environmental conservation. 2. “Board” means the state board on temporary nuclear waste repository siting established by section 18-105 of this article. 3. “Application” means an application for a certificate. 4. “Certificate” means a temporary nuclear waste […]
18-103 – Establishment of Temporary Nuclear Waste Repositories.
§ 18-103. Establishment of temporary nuclear waste repositories. 1. No person shall establish or operate a temporary nuclear waste repository within this state unless he has been granted a certificate by the board. Any such temporary nuclear waste repository with respect to which a certificate is issued shall not thereafter be built, maintained or operated […]
18-105 – State Board on Temporary Nuclear Waste Repository Siting.
§ 18-105. State board on temporary nuclear waste repository siting. 1. There is hereby created the state board on temporary nuclear waste repository siting. The board shall consist of the commissioner of environmental conservation, the commissioner of health, and three ad hoc members appointed by the governor, one of whom shall be from the judicial […]