Section 4906.201 | Setback Requirements.
Effective: September 15, 2014 Latest Legislation: House Bill 483 – 130th General Assembly (A) An electric generating plant that consists of wind turbines and associated facilities with a single interconnection to the electrical grid that is designed for, or capable of, operation at an aggregate capacity of fifty megawatts or more is subject to the […]
Section 4906.21 | Decommissioning Plan for Solar and Wind Generation Required.
Effective: October 11, 2021 Latest Legislation: Senate Bill 52 – 134th General Assembly (A) For the purposes of this section and sections 4906.21 to 4906.232 of the Revised Code: (1) “Applicant” means an applicant for a certificate, or a material amendment to an existing certificate, from the power siting board to construct, operate, or maintain […]
Section 4906.211 | Decommissioning Plan Requirements and Estimated Costs.
Effective: October 11, 2021 Latest Legislation: Senate Bill 52 – 134th General Assembly (A) The decommissioning plan submitted to the power siting board under section 4906.21 of the Revised Code shall be prepared by a professional engineer registered with the state board of registration for professional engineers and surveyors. The board may reject the engineer […]
Section 4906.212 | Decommissioning Estimated Costs Recalculation.
Effective: October 11, 2021 Latest Legislation: Senate Bill 52 – 134th General Assembly The estimate of the total decommissioning costs of a utility facility, as described in division (B)(3) of section 4906.211 of the Revised Code, shall be recalculated every five years by an engineer retained by the applicant. Last updated July 23, 2021 at […]
Section 4906.22 | Decommissioning Performance Bond Required.
Effective: October 11, 2021 Latest Legislation: Senate Bill 52 – 134th General Assembly (A) Prior to beginning construction, the applicant shall post a performance bond to ensure that funds are available for the decommissioning of the facility. (B) The power siting board shall be the obligee of the bond. Last updated July 23, 2021 at […]
Section 4906.221 | Decommissioning Performance Bond Amount.
Effective: October 11, 2021 Latest Legislation: Senate Bill 52 – 134th General Assembly The performance bond required by section 4906.22 of the Revised Code shall be equal to the estimate of the costs of decommissioning included in the decommissioning plan described in section 4906.211 of the Revised Code. Last updated July 23, 2021 at 4:57 […]
Section 4906.11 | Opinion Stating Reason for Decision.
Effective: November 15, 1981 Latest Legislation: House Bill 694 – 114th General Assembly In rendering a decision on an application for a certificate, the power siting board shall issue an opinion stating its reasons for the action taken.
Section 4906.06 | Certificate Application.
Effective: September 10, 2012 Latest Legislation: Senate Bill 315 – 129th General Assembly (A) An applicant for a certificate shall file with the office of the chairperson of the power siting board an application, in such form as the board prescribes, containing the following information: (1) A description of the location and of the major […]
Section 4906.07 | Public Hearing on Application.
Effective: September 10, 2012 Latest Legislation: Senate Bill 315 – 129th General Assembly (A) Upon the receipt of an application complying with section 4906.06 of the Revised Code, the power siting board shall promptly fix a date for a public hearing thereon, not less than sixty nor more than ninety days after such receipt, and […]
Section 4906.08 | Parties – Testimony.
Effective: April 7, 2004 Latest Legislation: House Bill 133 – 125th General Assembly (A) The parties to a certification proceeding shall include: (1) The applicant; (2) Each person entitled to receive service of a copy of the application under division (B) of section 4906.06 of the Revised Code, if the person has filed with the […]