Section 301 – Notice of intent to file — Content — Prefiling procedures.
54-18-301. Notice of intent to file — Content — Prefiling procedures. (1) If a public utility conducts any field work in preparation of establishing a target study area before a notice of intent is filed in accordance with Subsection (2)(a), the public utility shall first notify the local land use authority of the public utility’s […]
Section 302 – Public workshops.
54-18-302. Public workshops. After a public utility files the notice of intent in accordance with Subsection 54-18-301(3) and before it files a land use application, the public utility shall: (1) conduct informal public workshops at locations along the proposed corridor to provide information about: (a) the high voltage power line; and (b) the process for […]
Section 303 – Application for land use permit.
54-18-303. Application for land use permit. (1) Before a public utility may file a land use application for a proposed high voltage power line, the public utility shall, in accordance with Subsection (2), identify a proposed corridor in the public utility’s land use application after: (a) providing a notice of intent in accordance with Section […]
Section 304 – Review of land use application.
54-18-304. Review of land use application. (1) (a) A land use authority shall grant or deny a public utility’s land use permit within 60 days after filing in accordance with the provisions of Title 10, Chapter 9a, Municipal Land Use, Development, and Management Act, and Title 17, Chapter 27a, County Land Use, Development, and Management […]
Section 305 – Appeal of high voltage power line route.
54-18-305. Appeal of high voltage power line route. This chapter does not affect a public utility’s or local government’s right to appeal a high voltage power line route to the Utility Facility Review Board in accordance with the provisions of Chapter 14, Utility Facility Review Board Act. Amended by Chapter 89, 2013 General Session
Section 201 – Public utility to obtain approval for high voltage power lines.
54-18-201. Public utility to obtain approval for high voltage power lines. (1) Except as provided in Subsections (2) and (3), a public utility shall comply with the requirements of this chapter before beginning construction or operation of: (a) a high voltage power line; or (b) an upgraded high voltage power line. (2) A public utility […]