Effective 9/1/2018 54-21-301. Applicability — General. (1) This part applies to: (a) the collocation of a small wireless facility in a right-of-way; (b) the collocation of a small wireless facility on a wireless support structure in a right-of-way; and (c) the installation, modification, or replacement of a utility pole associated with a small wireless facility […]
Effective 9/1/2018 54-21-302. Permitting process, requirements, and limitations. (1) An authority may require an applicant to obtain a permit to: (a) collocate a small wireless facility in a right-of-way; or (b) install a new, modified, or replacement utility pole associated with a small wireless facility in a right-of-way, as provided in Section 54-21-204. (2) If […]
Effective 9/1/2018 54-21-303. Exceptions to permitting. (1) Except as provided in Subsection (2), an authority may not require a wireless provider to submit an application, obtain a permit, or pay a rate for: (a) routine maintenance; (b) the replacement of a small wireless facility with a small wireless facility that is substantially similar or smaller […]