US Lawyer Database

Section 202 – Prohibition on exclusive use.

Effective 9/1/2018 54-21-202. Prohibition on exclusive use. An authority may not enter into an exclusive arrangement with any person for: (1) use of a right-of-way for the collocation of a small wireless facility; or (2) the installation, operation, marketing, modification, maintenance, or replacement of a utility pole. Enacted by Chapter 299, 2018 General Session

Section 105 – Innovative utility programs.

Effective 5/14/2019 54-20-105. Innovative utility programs. (1) The commission may authorize, subject to funding available under Subsection 54-7-12.8(6)(b)(ii)(B), a large-scale electric utility to implement programs that the commission determines are in the interest of large-scale electric utility customers to provide for the investigation, analysis, and implementation of: (a) an economic development incentive rate; (b) a […]

Section 106 – Extension of pilot program.

Effective 5/10/2016 54-20-106. Extension of pilot program. Before the first day of the legislative session in the final year of the pilot program period, the commission shall submit a report and recommendation to the Legislature regarding whether, in the discretion of the commission, the Legislature should, for the sustainable transportation and energy plan: (1) extend […]

Section 107 – Other programs.

Effective 5/14/2019 54-20-107. Other programs. The commission may authorize a large-scale electric utility or a large-scale natural gas utility to establish a program in addition to the programs described in this chapter if the commission determines that the program is cost-effective and in the public interest. Amended by Chapter 460, 2019 General Session

Section 103 – Electric vehicle incentive program.

Effective 5/10/2016 54-20-103. Electric vehicle incentive program. (1) The commission shall, before July 1, 2017, authorize a large-scale electric utility to establish a program that promotes customer choice in electric vehicle charging equipment and service that includes: (a) an incentive to a large-scale electric utility customer to install or provide electric vehicle infrastructure; (b) time […]

Section 104 – Clean coal technology program.

Effective 5/10/2016 54-20-104. Clean coal technology program. (1) Subject to Subsection (2), the commission shall authorize, before July 1, 2017, and, subject to funding, approve a program that authorizes a large-scale electric utility to investigate, analyze, and research clean coal technology. (2) The commission may review the expenditures made by a large-scale electric utility for […]

Section 103 – Authority over Internet protocol-enabled services and voice over Internet protocol services.

54-19-103. Authority over Internet protocol-enabled services and voice over Internet protocol services. (1) A state agency and political subdivision of the state may not, directly or indirectly, regulate Internet protocol-enabled service or voice over Internet protocol service. (2) The regulatory prohibition in Subsection (1) does not: (a) affect or limit the enforcement of criminal or […]

Section 301 – Notice of intent to file — Content — Prefiling procedures.

54-18-301. Notice of intent to file — Content — Prefiling procedures. (1) If a public utility conducts any field work in preparation of establishing a target study area before a notice of intent is filed in accordance with Subsection (2)(a), the public utility shall first notify the local land use authority of the public utility’s […]

Section 302 – Public workshops.

54-18-302. Public workshops. After a public utility files the notice of intent in accordance with Subsection 54-18-301(3) and before it files a land use application, the public utility shall: (1) conduct informal public workshops at locations along the proposed corridor to provide information about: (a) the high voltage power line; and (b) the process for […]

Section 303 – Application for land use permit.

54-18-303. Application for land use permit. (1) Before a public utility may file a land use application for a proposed high voltage power line, the public utility shall, in accordance with Subsection (2), identify a proposed corridor in the public utility’s land use application after: (a) providing a notice of intent in accordance with Section […]