§5-22A-3. Public Policy; Conditions for Contract
(a) Recognizing that the design-bid-build method provides a viable delivery method for public projects, it is the public policy of this state to permit an agency to enter into design-build contracts for public projects. (b) An agency may not enter into a design-build contract for a public project unless: (1) The Department of Administration promulgates […]
§5-22A-4. Design-Build Board and Members; Appointments; Expense Reimbursement; Meetings
(a) The Design-Build Board is continued within the Department of Administration and is composed of the following nine members who are appointed by the Governor with the advice and consent of the Senate: Two contractors licensed in the State of West Virginia; one architect licensed in the State of West Virginia; one professional engineer licensed […]
§5-22A-5. Duties of Board to Approve and Monitor Projects
(a) Upon receipt of information that an agency wants to pursue the design-build method of project delivery, the board, with the administrative support of the Secretary of the Department of Administration, shall notify the agency that failure to comply with the requirements of this article is a violation of state law. The Board shall notify […]
§5-22A-6. Design-Build Rules
The Department of Administration shall propose rules for legislative approval pursuant to article three, chapter twenty-nine-a of this code and consistent with this article for the award of design-build contracts, which provide, at a minimum: (1) The procedures to select or designate a performance criteria developer and prepare performance criteria;
§5-22-1. Bidding Required; Government Construction Contracts to Go to Lowest Qualified Responsible Bidder; Procedures to Be Followed in Awarding Government Construction Projects; Penalties for Violation of Procedures and Requirements Debarment; Exceptions
(a) This section and the requirements in this section may be referred to as the West Virginia Fairness in Competitive Bidding Act. (b) As used in this section: (1) “Lowest qualified responsible bidder” means the bidder that bids the lowest price and that meets, at a minimum, all the following requirements in connection with the […]
§5-22-1a. Permitting Government Construction Contracts Arising Out of Declared States of Emergency on Open-Ended Quantity or Unit Price Basis; Types of Contracts Allowed for Construction Projects; Specific Location of Construction Project Not Required in Solicitation; Certain Bonds Discretionary; Other Bidding Requirements Applicable
(a) The state, not including its subdivisions, may solicit competitive bids for construction projects arising out of a state of emergency declared pursuant to §15-5-6 of this code, in a manner that is open-ended as to quantity only, or for unit prices on estimated quantities, and may also award contracts to multiple qualified responsible bidders, […]
§5-20-5. Executive Sessions Authorized; Demand to Be Heard in Open Hearing
[Repealed.]
§5-20-6. Immunity Granted to Commission Members
[Repealed.]
§5-20-7. Privilege Granted to Commission Findings, Reports and Evidence
[Repealed.]
§5-20-8. Reports of the Commission; Termination of Commission
[Repealed.]