US Lawyer Database

For Lawyer-Seekers

YOU DESERVE THE BEST LAWYER

87.01 – Definitions.

87.01 Definitions. In this chapter: (1) “Department” means the department of natural resources. (2) “Drainage area” means any parcel or parcels of land within the area whose drainage causes or contributes to flood conditions upon or in the vicinity of a designated stream or body of water. (3) “Equalized assessed value” means: (a) As applied […]

87.02 – Powers of department.

87.02 Powers of department. To accomplish the purposes of ss. 87.01 to 87.17, the department of natural resources is hereby authorized and empowered: (1) To order the straightening, widening, altering, deepening, changing or the removing of obstructions from the course of any river, watercourse, pond, lake, creek or natural stream, ditch, drain or sewer, and […]

87.03 – Petition for flood works.

87.03 Petition for flood works. Any 25 owners of lands which have been recurrently flooded by the waters of any designated stream, lake or pond or any tributaries thereof, or any public corporation within whose boundaries are located any lands subject to such overflow, may file with the department a written petition setting forth: (1) […]

87.04 – Action on petition.

87.04 Action on petition. (1) Upon the filing of any petition as authorized by s. 87.03, the department shall give the project a name embodying the name of the principal river or body of water involved in the project, and shall fix a date and place of hearing upon the petition, the date being so […]

87.05 – Scope of hearing.

87.05 Scope of hearing. The hearing under s. 87.04 shall be confined to the question whether the improvement prayed for in the petition is required by the public health, safety, convenience or welfare. Any person interested may appear at such hearing in person or by attorney and be heard upon said question without the filing […]

87.06 – Court review of dismissal.

87.06 Court review of dismissal. An order dismissing the petition shall be subject to review in the manner provided in ch. 227. An order directing the hearing to proceed shall not be subject to review except upon review of the final order made pursuant to s. 87.07.

87.07 – Preliminary order.

87.07 Preliminary order. (1) Survey and report. If the department’s order, made pursuant to s. 87.05, shall direct the hearing to proceed, the department shall at the same time direct its engineering department to make a survey in the form of a preliminary investigation and to file a report: (a) Determining and showing upon a […]

87.075 – Special procedure.

87.075 Special procedure. (1) Notwithstanding any other provision of this chapter, the department may, as provided in this section, at any time after directing the hearing upon the petition to proceed made under s. 87.05, issue an order stating that a flood control board shall be appointed as provided in s. 87.12, in which event […]

87.076 – Financing.

87.076 Financing. Any flood control project other than a project described in s. 87.04 (2) may, in addition to any other method of financing mentioned in this chapter, be financed from funds received in whole or in part by the flood control board from any governmental agency or other person. To implement this section, every […]

87.08 – Petition of board; modification of order, court review.

87.08 Petition of board; modification of order, court review. Upon petition of the flood control board organized pursuant to s. 87.12 for the purpose of carrying out the final order of the department, the department may at any time, after public hearing, modify its final orders insofar as the same relate to the plans and […]

87.085 – Federal cooperation.

87.085 Federal cooperation. Any public corporation or flood control board acting under its powers and in conformity with state law may enter into an agreement with an agency of the federal government to cooperate in the construction, operation or maintenance of any federally authorized project contemplated under this chapter or to assume any potential liability […]

87.09 – Assessment of benefits.

87.09 Assessment of benefits. The department shall determine the parcel or parcels of land benefited directly or indirectly and shall levy such assessment in proportion to the benefit accruing to such parcel or parcels of land.

87.095 – Public park lands not benefited by improvement.

87.095 Public park lands not benefited by improvement. For the purposes of this chapter it is determined that public park lands are not benefited either directly or indirectly by such improvement, and shall not be considered in the assessment of benefits made by the department or by the flood control board acting under the provisions […]

87.10 – Collection of assessments; bonds.

87.10 Collection of assessments; bonds. (1) Upon the making of a final order directing the work to proceed, as provided in s. 87.07, the department shall forward a certified copy of its findings and the order based thereon to the clerk of each town, village and city in which any land or other property benefited […]

87.12 – Flood control board, creation, duties, powers, pay, funds.

87.12 Flood control board, creation, duties, powers, pay, funds. (1) If the department directs the work of constructing the improvement to proceed as provided in s. 87.07, it shall certify the fact of the making of such order to the governor, together with a statement of the county in which the major part of the […]

87.13 – Disbursements by board.

87.13 Disbursements by board. All sums which shall be deposited with the secretary of administration under s. 87.07 (4) for the construction of the improvement shall be paid by the secretary of administration to the flood control board upon requisitions from said board. If any moneys, other than those for operation and maintenance during the […]

87.14 – Operation and maintenance.

87.14 Operation and maintenance. The flood control board is authorized to sell, lease, or lease with power to purchase, any reservoir proposed to be constructed, in the process of construction or completed, to a duly organized river improvement company as defined by s. 182.016, on such terms and conditions as are approved by the department […]

87.15 – Repairs, replacements and extensions; procedure.

87.15 Repairs, replacements and extensions; procedure. Whenever the flood control board shall determine and certify that repairs or replacements are necessary to such an extent as to amount to a partial reconstruction of the improvement rather than ordinary maintenance, or whenever said board shall determine that material additions, extensions or betterments to said improvement are […]

87.16 – Court proceedings given preference.

87.16 Court proceedings given preference. Any action brought in any court for the purpose of enjoining, preventing or interfering with the construction, repairing, reconstruction, operation or maintenance of the improvement ordered by the department, or any part thereof, except actions to review the orders of the department under ss. 87.01 to 87.17, shall be given […]