Section 41-4-516 – Rules and Regulations Authorized for w.s. 41-4-514 Through 41-4-516.
41-4-516. Rules and regulations authorized for W.S. 41-4-514 through 41-4-516. The state engineer is hereby authorized to provide rules and regulations regarding the form of application and procedure to be followed by the applicant in proceeding under this act.
Section 41-4-517 – Appeal From Action of State Engineer or Order of Board of Control.
41-4-517. Appeal from action of state engineer or order of board of control. Any applicant who is aggrieved by the endorsement made by the state engineer upon his application, may, in writing, in an informal manner and without pleadings of any character, appeal to the board of control within sixty (60) days of the date […]
Section 41-4-515 – Endorsement of Correction on Records.
41-4-515. Endorsement of correction on records. When any permit is corrected by the state engineer, as authorized by this act, the corrections shall be endorsed on the records and shall not affect the priority of the permit.
Section 41-4-509 – Maps and Plats; Additional Information; Longitudinal Profiles of Ditches.
41-4-509. Maps and plats; additional information; longitudinal profiles of ditches. In case of ditches or canals carrying more than fifty (50) cubic feet of water per second, the engineer may require, in addition to the maps or plats above described, the following: a longitudinal profile of the ditch showing the bottom and proposed water line; […]
Section 41-4-510 – Maps and Plats; Additional Information; Cross Section Plans; Plans of Obstructions; Reservoir Specifications; Field Notes.
41-4-510. Maps and plats; additional information; cross section plans; plans of obstructions; reservoir specifications; field notes. The engineer may require, in addition to the maps and plats above described, a plan showing cross sections at a sufficient number of points to show the different forms which the ditch, when completed, will take, and showing what […]
Section 41-4-511 – Final Proof of Appropriation; Procedures Generally.
41-4-511. Final proof of appropriation; procedures generally. Whenever an appropriation of water has been perfected in accordance with any permit issued by the state engineer, the appropriator may submit final proof of appropriation of water at any time within the time specified by W.S. 41-4-506, to the superintendent of the water division in which the […]
Section 41-4-512 – Final Proof of Appropriation; Date of Priority.
41-4-512. Final proof of appropriation; date of priority. The priority of such appropriation shall date from the filing of the application in the engineer’s office.
Section 41-4-513 – Adjudication of Underground Water Rights.
41-4-513. Adjudication of underground water rights. After issuance of a permit, or recording of a statement of claim, or registration of a well, under the procedures provided for by law, and completion of the work according to the terms of the permit, as certified to by the state engineer or his authorized representative following an […]
Section 41-4-514 – Petition for Amendment of Permits; Petition for Amended Certificate of Appropriation; Hearings on Petition; Notice; Costs.
41-4-514. Petition for amendment of permits; petition for amended certificate of appropriation; hearings on petition; notice; costs. (a) The state engineer may correct clerical errors and, upon written petition of the permit holder, amend any permit to appropriate water at any time prior to adjudication by the state board of control when in the judgment […]
Section 41-4-503 – Recordation; Approval or Rejection Generally.
41-4-503. Recordation; approval or rejection generally. All applications which shall comply with the provisions of this chapter, and with the regulations of the engineer’s office, shall be recorded in a suitable book kept for that purpose; and it shall be the duty of the state engineer to approve all applications made in proper form, which […]