Section 41-4-516 – Rules and Regulations Authorized for w.s. 41-4-514 Through 41-4-516.
41-4-516. Rules and regulations authorized for W.S. 41-4-514 through 41-4-516. The state engineer is hereby authorized to provide rules and regulations regarding the form of application and procedure to be followed by the applicant in proceeding under this act.
Section 41-4-517 – Appeal From Action of State Engineer or Order of Board of Control.
41-4-517. Appeal from action of state engineer or order of board of control. Any applicant who is aggrieved by the endorsement made by the state engineer upon his application, may, in writing, in an informal manner and without pleadings of any character, appeal to the board of control within sixty (60) days of the date […]
Section 41-5-101 – Ditches; Generally.
41-5-101. Ditches; generally. The owner or owners of any ditch for irrigation, or other purposes, shall carefully maintain the embankments thereof so that the water of such ditch may not flood or damage the premises of others.
Section 41-5-102 – Ditches; Jointly Owned; Action to Recover Proportionate Share of Work.
41-5-102. Ditches; jointly owned; action to recover proportionate share of work. In all cases where irrigating ditches are owned by two (2) or more persons and one (1) or more of such persons shall fail or neglect to do his, her or their proportionate share of the work necessary for the proper maintenance and operation […]
Section 41-5-103 – Ditches; Jointly Owned; Lien for Work.
41-5-103. Ditches; jointly owned; lien for work. Upon the failure of any co-owner to pay his proportionate share of such expense as mentioned in W.S. 41-5-102, within thirty (30) days after receiving a statement of the same as performed by his co-owner or owners, such person or persons so performing such labor may secure payment […]
Section 41-4-509 – Maps and Plats; Additional Information; Longitudinal Profiles of Ditches.
41-4-509. Maps and plats; additional information; longitudinal profiles of ditches. In case of ditches or canals carrying more than fifty (50) cubic feet of water per second, the engineer may require, in addition to the maps or plats above described, the following: a longitudinal profile of the ditch showing the bottom and proposed water line; […]
Section 41-4-510 – Maps and Plats; Additional Information; Cross Section Plans; Plans of Obstructions; Reservoir Specifications; Field Notes.
41-4-510. Maps and plats; additional information; cross section plans; plans of obstructions; reservoir specifications; field notes. The engineer may require, in addition to the maps and plats above described, a plan showing cross sections at a sufficient number of points to show the different forms which the ditch, when completed, will take, and showing what […]
Section 41-4-511 – Final Proof of Appropriation; Procedures Generally.
41-4-511. Final proof of appropriation; procedures generally. Whenever an appropriation of water has been perfected in accordance with any permit issued by the state engineer, the appropriator may submit final proof of appropriation of water at any time within the time specified by W.S. 41-4-506, to the superintendent of the water division in which the […]
Section 41-4-512 – Final Proof of Appropriation; Date of Priority.
41-4-512. Final proof of appropriation; date of priority. The priority of such appropriation shall date from the filing of the application in the engineer’s office.
Section 41-4-513 – Adjudication of Underground Water Rights.
41-4-513. Adjudication of underground water rights. After issuance of a permit, or recording of a statement of claim, or registration of a well, under the procedures provided for by law, and completion of the work according to the terms of the permit, as certified to by the state engineer or his authorized representative following an […]