    When the Commission acquires an existing water or sewer system other than a municipal system, the Commission may impose a front foot benefit charge less than the uniform front foot benefit charge required in § 25–204 of this subtitle if:

        (1)    the construction cost of the system has been added, wholly or partly, to the purchase price of the property that abuts on the system; and

        (2)    the addition of the construction cost is a factor in the cost of the system to the Commission.