A person may not install a manufactured dwelling or an accessory building or structure without first obtaining from the Department of Consumer and Business Services or a municipality as provided under ORS 446.250 all permits necessary for installing the manufactured dwelling or the accessory building or structure on a lot. [1989 c.1017 §2; 1995 c.251 §6; 1997 c.205 §4; 2019 c.422 §10]