(1) The owner of any ditch or canal shall maintain to the satisfaction of the Water Resources Commission a substantial headgate at the point where the water is diverted. It shall be of such construction that it can be locked and kept closed by the watermaster. (2) The owner shall construct and maintain, when required […]
If any owner of irrigation works refuses or neglects to construct and put in headgates, flumes or measuring devices, as required under ORS 540.310, after 10 days’ notice, the watermaster may close the ditch, and it shall not be opened or any water diverted from the source of supply, under the penalties prescribed by law […]
(1) Any owner or manager of a reservoir, located across or upon the bed of a natural stream, shall construct and maintain, when required by the Water Resources Commission, a measuring device below, and one above, the reservoir on each stream or source of supply discharging into the reservoir, to assist the watermaster in determining […]
(1) Whenever it may be necessary for the protection of other water users, the Water Resources Commission shall require every owner or manager of a reservoir or diversion dam, located across or upon the bed of a natural stream, to construct and maintain a suitable outlet in the reservoir or diversion dam which will allow […]
(1) The Water Resources Department may inspect, evaluate and assess the condition of a levee, dike, ditch or other hydraulic structure with the permission of the owner. (2) In performing the actions under subsection (1) of this section, the department may: (a) Provide recommendations and technical assistance; (b) Advise on necessary maintenance and repairs; (c) […]
Whenever the owner, manager or lessee of a reservoir constructed under the provisions of the Water Rights Act, as defined in ORS 537.010, desires to use the bed of a stream, or other watercourse, to carry stored or impounded water from the reservoir to the consumer of the water, the owner, manager or lessee shall, […]
In all cases where ditches are owned by two or more persons and one or more of such persons fails or neglects to do a proportionate share of the work necessary for the proper maintenance and operation of the ditch, or to construct suitable headgates or measuring devices at the points where water is diverted […]
(1) Upon the failure of any co-owner to pay a proportionate share of the expense, as mentioned in ORS 540.420, within 30 days after receiving a statement of the same as performed by the co-owner, the latter may secure payment of the claim by filing an itemized and sworn statement thereof, setting forth the date […]
(1) In addition to any other authority of the Water Resources Commission to order installation of a measuring device, if the commission finds accurate water use information necessary because of serious water management problems created by ground water decline, unresolved user disputes or frequent water shortages, the commission by rule may require a water right […]
All persons owning or controlling any water ditches shall keep their right of way along the ditches clean and free from wild oats, mustard, thistles, or any weeds or noxious grasses whatsoever. [Amended by 2011 c.9 §73]