If a project dedicates water to in-stream use under the requirements described in ORS 541.681 or as allowed under ORS 541.683, the Water Resources Department shall protect the dedicated water in-stream consistent with the priority of the dedicated water source. Dedicated water from projects may come from newly developed water or from other sources and […]
(1) The Water Resources Department shall make a determination as provided under subsection (2) of this section if an application for a loan or grant from the Water Supply Development Account is for a project that requires a water storage or aquifer recharge permit or limited license for the storage of water outside of the […]
(1) Before loan or grant moneys are expended from the Water Supply Development Account for the construction of a project, the recipient must obtain all applicable local, state and federal permits. Project materials must include a notation indicating that Water Resources Department funding was used for the project. (2) The loans or grants may be […]
[1971 c.754 §12; 1977 c.417 §3; 1989 c.837 §19; renumbered 196.770 and then 196.905 in 1989]
(1) The Water Resources Commission shall adopt rules establishing standards for borrowers obtaining loans issued from the Water Supply Development Account. The commission shall design the standards to ensure that all loans have a high probability of repayment and that all loans are adequately secured in the event of a default. The commission shall solicit […]