A toll road or toll highway company shall be formed under Colorado law. On and after June 2, 2008, a toll road or toll highway company may not specify and map a transportation corridor in its filed formation document, and any corridor included in a filed formation document filed before June 2, 2008, shall not […]
As used in this article, unless the context otherwise requires: “Associated rail corridor” means a corridor for a proposed rail line and any related rail facilities necessary for the operation of a rail line that are to be located in the right-of-way of a toll road or toll highway. “Associated service area” means a gas […]
A preexisting toll road or toll highway company shall commence work, including but not limited to planning, design, environmental mitigation, and other preconstruction work, on the toll road or toll highway proposed in its filed formation document no later than three years after the filing of the document or within one year after receiving all […]
Notwithstanding the provisions of section 38-2-101, C.R.S., on and after June 6, 2006, a preexisting toll road or toll highway company shall not have the power to exercise the right of eminent domain to acquire any part of the right-of-way of the three-mile corridor of a proposed toll road or toll highway specified in the […]
A preexisting or new toll road or toll highway company shall not commence the construction of a toll road or toll highway or of any other element of a toll road or toll highway project until the toll road or toll highway or other element has been reviewed by every metropolitan planning organization or regional […]
Before constructing and operating a toll road or toll highway or any other element of a toll road or toll highway project, a toll road or toll highway company shall prepare, at its own expense, environmental documentation that complies with the environmental stewardship guide approved by the transportation commission in May 2005. The documentation shall […]
When constructing and maintaining a toll road or toll highway or any other element of a toll road or toll highway project, a toll road or toll highway company shall comply with all department of transportation safety standards for state transportation projects. Source: L. 2006: Entire article R&RE, p. 1767, § 1, effective June 6.
Within ninety days of June 2, 2008: The county clerk and recorder of each county in which a preexisting toll road or toll highway company filed a disclaimer of interest and map pursuant to paragraph (b) of this subsection (1), as said paragraph (b) existed before June 2, 2008, shall transfer the map, but not […]
Any interest in real property that is obtained by a preexisting toll road or toll highway company, other than a leasehold interest in property or rights-of-way acquired and owned by the department of transportation as authorized in section 7-45-104, within the three-mile corridor specified and mapped in its filed formation document as was required by […]
If any interest in a preexisting or new toll road or toll highway company is sold or transferred, the toll road or toll highway company shall continue to comply with the limitations set forth in section 7-45-109. If a preexisting or new toll road or toll highway company sells or transfers any interest in its […]
Nothing contained in this article shall prohibit a toll road or toll highway company from entering into a public-private initiative with the department of transportation in accordance with the provisions of part 12 of article 1 of title 43, C.R.S., for the purpose of enabling the construction of a toll road, toll highway, or project. […]