5-30-8-3. Adjustment of Maximum Cost by Agreement

Sec. 3. After award under this article, the maximum cost established in the successful proposal may be adjusted by negotiated agreement between the public agency and the design-builder to reflect modifications in the proposed design-build project. As added by P.L.74-2005, SEC.1.

5-30-8-4. Performance and Payment Bonds Required

Sec. 4. (a) The public agency: (1) shall require the design-builder to furnish performance and payment bonds for the project if the estimated cost of the project is more than two hundred thousand dollars ($200,000); and (2) may require the design-builder to furnish performance and payment bonds for the project if the estimated cost of […]

5-30-8-5. Certain Acts by Public Agency Prohibited

Sec. 5. A public agency may not, with respect to a public project covered by this article, require an offeror to: (1) make application to; (2) furnish financial data to; or (3) obtain any of the surety bonds, or surety bond components of wrap-up insurance, that are specified in connection with a design-build contract or […]

5-30-8-6. Repealed

As added by P.L.74-2005, SEC.1. Amended by P.L.18-2011, SEC.3; P.L.6-2012, SEC.39. Repealed by P.L.252-2015, SEC.17.

5-30-8-7. Repealed

As added by P.L.252-2015, SEC.18. Repealed by P.L.250-2015, SEC.1; P.L.122-2016, SEC.2.