Section 20-101 – Definitions

    (a)    In this subtitle the following words have the meanings indicated.     (b)    “Design/build contract” means a contract that provides for both architectural and engineering design services and construction services as a part of a single contract.     (c)    “Evaluated bid price” means the price of a bid after adjustment in accordance with objective measurable criteria.     (d)    “Facilities construction contract” means […]

Section 20-102 – Scope of Subtitle

    This subtitle applies only to:         (1)    design/build contracts; and         (2)    construction contracts.

Section 20-103 – Compliance Required

    If the Commission decides to proceed with the design or construction of a water supply or sanitary sewer system, the Commission shall comply with the requirements of this subtitle.

Section 20-104 – Design and Construction of System — in General

    (a)    The Commission shall provide an opportunity for a hearing before proceeding with the design or construction of a water supply or sanitary sewer system.     (b)    Subject to subsection (c) of this section, the Commission:         (1)    shall advertise in newspapers and technical media that the Commission considers appropriate for bids or proposals for design or construction services for […]

Section 20-105 – Methods of Source Selection

    (a)    The Commission shall award contracts by:         (1)    competitive sealed bids in accordance with subsection (b) of this section; or         (2)    competitive sealed proposals in accordance with subsection (c) of this section.     (b)    (1)    If a contract is awarded based on competitive sealed bids, the Commission shall seek bids by issuing an invitation for bids.         (2)    Subject to paragraphs (3) through […]