Section 116.84 — Monitors Required For Pcb Incinerators.

116.84 MONITORS REQUIRED FOR PCB INCINERATORS. Notwithstanding any other law to the contrary, an incinerator permit issued to a facility that allows burning of PCBs must, as a condition of the permit, require the installation of a continuous emission monitoring system approved by the commissioner. The monitoring system must provide continuous emission measurements to ensure […]

Section 116.85 — Monitors Required For Other Incinerators.

116.85 MONITORS REQUIRED FOR OTHER INCINERATORS. Subdivision 1. Emission monitors. Notwithstanding any other law to the contrary, an incinerator permit that contains emission limits for dioxin, cadmium, chromium, lead, or mercury must, as a condition of the permit, require the installation of an air emission monitoring system approved by the commissioner. The monitoring system must […]