Section 46-4-1 – Dry-draw on agricultural lands–Right to construct dam–Right or permit for dam on stream or dry-draw subject to prior appropriation.

46-4-1. Dry-draw on agricultural lands–Right to construct dam–Right or permit for dam on stream or dry-draw subject to prior appropriation. Upon compliance with §46-4-3, any person who has or holds any possession, right or title to any agricultural lands may construct a dam across a dry-draw without obtaining a permit to appropriate water unless the […]

Section 46-4-1.1 – Nonnavigable stream–Right to construct and maintain dam.

46-4-1.1. Nonnavigable stream–Right to construct and maintain dam. Any person owning land through which any nonnavigable stream passes may construct and maintain a dam across the nonnavigable stream if the course of the water is not changed, vested rights are not interfered with and no land flooded other than that belonging to the owner of […]

Section 46-4-3 – Location notice required–Filing.

46-4-3. Location notice required–Filing. Any person desiring to take advantage of any of the rights provided in this chapter shall file a location notice with the register of deeds of the county in which the right is located and shall mail a copy of the notice to the Water Management Board. Source: SDC 1939, §61.0133; […]

Section 46-4-4 – Location notice–Contents–Verification.

46-4-4. Location notice–Contents–Verification. The location notice required under the provisions of §46-4-3 shall contain the following information: (1)The name and address of the landowner and of the locator; (2)The date of the notice; (3)The legal description of the land upon which the dam is to be located; (4)The total number of acre-feet of water claimed […]

Section 46-4-5 – Vested right to water from dry-draw.

46-4-5. Vested right to water from dry-draw. The right of any person to continue the use of water from any dry-draw is a vested right, to the extent it is not abandoned or forfeited and: (1)The water had actually been applied to a beneficial use on March 18, 1957, or within three years immediately before […]

Section 46-4-6 – Time for construction and completion of dam.

46-4-6. Time for construction and completion of dam. Any person appropriating the waters of any dry-draw or watercourse within this state, within sixty days after the filing of the notice provided for in §§46-4-3 and 46-4-4, shall begin the construction of the dam mentioned in §46-4-1 for the storage or diversion of the waters, shall […]