US Lawyer Database

For Lawyer-Seekers

YOU DESERVE THE BEST LAWYER

Home » US Law » 2022 Utah Code » Title 10 - Utah Municipal Code » Chapter 9a - Municipal Land Use, Development, and Management Act » Part 9 - Vested Critical Infrastructure Materials Operations

Section 902 – Vested critical infrastructure materials operations — Conclusive presumption.

Effective 5/14/2019 10-9a-902. Vested critical infrastructure materials operations — Conclusive presumption. (1) (a) Critical infrastructure materials operations operating in accordance with a legal nonconforming use or a permit issued by the municipality are conclusively presumed to be vested critical infrastructure materials operations if the critical infrastructure materials operations permitted by the municipality, existed or was […]

Section 903 – Rights of a critical infrastructure materials operator with a vested critical infrastructure materials operations.

Effective 5/14/2019 10-9a-903. Rights of a critical infrastructure materials operator with a vested critical infrastructure materials operations. Notwithstanding a political subdivision’s prohibition, restriction, or other limitation on a critical infrastructure materials operations adopted after the establishment of the critical infrastructure materials operations, the rights of a critical infrastructure materials operator with vested critical infrastructure materials […]

Section 904 – Notice.

Effective 5/14/2019 10-9a-904. Notice. For any new subdivision development located in whole or in part within 1,000 feet of the boundary of a vested critical infrastructure materials operations, the owner of the development shall provide notice on any plat filed with the county recorder the following notice: “Vested Critical Infrastructure Materials Operations This property is […]

Section 905 – Abandonment of a vested critical infrastructure materials operations.

Effective 5/14/2019 10-9a-905. Abandonment of a vested critical infrastructure materials operations. (1) A critical infrastructure materials operator may abandon some or all of a vested critical infrastructure materials operations use only as provided in this section. (2) To abandon some or all of a vested critical infrastructure materials operations, a critical infrastructure materials operator shall […]