Section 2 – Bear River feasibility studies.
73-10f-2. Bear River feasibility studies. (1) The division is directed to undertake a study of the feasibility of developing the Bear River. This study shall include the following components: (a) an assessment of present water supplies, uses, and rights and future water needs in counties within the Bear River Basin and along the Wasatch Front; […]