(a) The Legislature hereby declares and finds that the venting of coalbed methane from mine areas and degasification of coal seams has been and continues to be approved by the state for the purpose of ensuring the safe recovery of coal; that the value of coal is far greater than the value of coalbed methane […]
All persons described in subsection (a), section nine of this article may file comments with the chief as to the location or construction of the applicant's proposed well within fifteen days after the application is filed with the chief.
The owner or operator of any coal seam whose interests may be adversely affected by a coalbed methane well may, within fifteen days from the receipt of notice required by section nine of this article, file objections in writing to such proposed drilling with the chief, setting out the grounds on which such objections are […]
The chief shall review each application for a permit and shall determine whether or not a permit shall be issued. No permit shall be issued less than fifteen days after the filing date of the application for any well work except plugging or replugging; and no permit for plugging or replugging shall be issued less […]
(a) If comment or objection is filed under section ten or eleven of this article, the chief shall forthwith provide to the chairman of the coalbed methane review board a copy of any such objection or comment, together with the application for a permit for the coalbed methane well in question, the plat filed therewith […]
(a) Except for those coalbeds which the coalbed methane operator proposes to complete for production of coalbed methane or where a ventilation hole is being converted to a well, when a well penetrates one or more workable coalbeds, the well operator shall run and cement a string of casing in the hole through the workable […]
(a) In the absence of a voluntary agreement, an operator, owner or other party claiming an ownership interest in the coalbed methane may file an application with the chief to pool: (i) Separately owned interests in a single tract; (ii) separately owned tracts; (iii) separately owned interests in any tract; and (iv) any combination of […]
(a) At least thirty days prior to the date set for hearing under section seventeen of this article, the applicant shall deliver by personal service or by certified mail, return receipt requested, notice to the following: (1) Each coal owner of record and coal operator of record of any coal seam underlying any tract or […]
(a) Prior to the time fixed for a hearing under subsection (b) of this section, the board shall also set a time and place for a conference between the proposed applicant to operate a coalbed methane drilling unit and all persons to whom notice has been given under subsection (a), section sixteen of this article […]
All operations including, but not limited to, the commencement, drilling or operation of a well upon a drilling unit for which a pooling order has been entered, are hereby deemed to be operations on each separately owned tract in the drilling unit by the several owners. That portion of the production allocated to a separately […]
No agreement between or among coalbed methane operators or owners entered into for the development of coalbed methane or forming drilling units therefor may be held to violate the statutory or common law of this state prohibiting monopolies or acts, arrangements, contracts, combinations or conspiracies in restraint of trade or commerce.
Unless the context in which used clearly requires a different meaning, as used in this article: (a) "Review board" means the West Virginia coalbed methane review board which shall be comprised of the members of the West Virginia shallow gas well review board provided for in article eight, chapter twenty-two-c of this code, the state […]
No coalbed methane well may be drilled closer than one hundred feet of the outermost boundary of the coalbed methane tract, leased premises, or unit from which coalbed methane is or will be produced or within one thousand six hundred linear feet of the location of an existing well or a proposed well for which […]
Any coalbed methane well which is completed as a dry hole or which has not produced coalbed methane in paying quantities for a period of twelve consecutive months shall be presumed to have been abandoned and the operator shall promptly plug the well and reclaim all surface land affected by the well in accordance with […]
(a) Prior to the commencement of plugging operations the operator shall give thirty days' advance notice to the chief and to all coal owners and operators whose names and addresses would be required for a permit application under subdivision (2), subsection (b), section six of this article as of the date of the notice. Such […]
All coalbed methane wells shall be plugged in such a manner that any workable coal seam surrounding the well can be safely mined and that the well can be mined through. The chief shall promulgate rules specifying the manner and method of plugging coalbed methane wells and in doing so, or in entering any order […]
Nothing in this article shall be construed to affect the mining and other property rights of any coal owner nor shall any provision of this article be construed to preclude a coal operator from removing support of the surface and any structure or facilities thereon and other strata as such rights may exist in any […]
(a) Any person adversely affected by an order of the chief or review board is entitled to judicial review. All of the pertinent provisions of section four, article five, chapter twenty-nine-a of this code apply to and govern the judicial review. (b) The judgment of the circuit court is final unless reversed, vacated or modified […]
In any case where title to subsurface minerals has been severed in such a way that title to natural gas underlying such tract and title to coal underlying such tract are in different persons, it shall be an affirmative defense to any action for willful trespass arising from the drilling and commercial production of methane […]
(a) Whenever it appears to the chief or review board that any person has been or is violating or is about to violate any provision of this article, any rule promulgated by the chief or review board, any order or any final decision of the chief or review board, the chief or review board may […]