US Lawyer Database

For Lawyer-Seekers

YOU DESERVE THE BEST LAWYER

Home » US Law » 2022 West Virginia Code » Chapter 22. Environmental Resources » Article 3. Surface Coal Mining and Reclamation Act

§22-3-1. Short Title

This article shall be known and cited as the Surface Coal Mining and Reclamation Act.

§22-3-10. Reclamation Plan Requirements

(a) Each reclamation plan submitted as part of a surface mining permit application shall include, in the degree of detail necessary to demonstrate that reclamation required by this article can be accomplished, a statement of: (1) The identification of the lands subject to surface mining over the estimated life of these operations and the size, […]

§22-3-11a. Special Reclamation Tax; Clarification of Imposition of Tax; Procedures for Collection and Administration of Tax; Application of Tax Procedure and Administration Act and Tax Crimes and Penalties Act

(a) It is the intent of the Legislature to clarify that from the date of its enactment, the special reclamation tax imposed pursuant to the provisions of section eleven of this article is intended to be in addition to any other taxes imposed on persons conducting coal surface mining operations including, but not limited to […]

§22-3-13. General Environmental Protection Performance Standards for Surface Mining; Variances

(a) Any permit issued by the secretary pursuant to this article to conduct surface mining operations shall require that the surface mining operations meet all applicable performance standards of this article and other requirements set forth in legislative rules proposed by the secretary. (b) The following general performance standards are applicable to all surface mines […]

§22-3-13a. Preblast Survey Requirements

(a) At least thirty days prior to commencing blasting, as defined in section twenty-two-a of this article, an operator or an operator’s designee shall make the following notifications in writing to all owners and occupants of man-made dwellings or structures that the operator or operator’s designee will perform preblast surveys in accordance with subsection (e) […]

§22-3-14. General Environmental Protection Performance Standards for the Surface Effects of Underground Mining; Application of Other Provisions of Article to Surface Effects of Underground Mining

(a) The director shall promulgate separate rules directed toward the surface effects of underground coal mining operations, embodying the requirements in subsection (b) of this section: Provided, That in adopting such rules, the director shall consider the distinct difference between surface coal mines and underground coal mines in West Virginia. Such rules may not conflict […]

§22-3-17. Notice of Violation; Procedure and Actions; Enforcement; Permit Revocation and Bond Forfeiture; Civil and Criminal Penalties; Appeals to the Board; Prosecution; Injunctive Relief

(a) If any of the requirements of this article, rules promulgated pursuant thereto or permit conditions have not been complied with, the director shall cause a notice of violation to be served upon the operator or the operator's duly authorized agent. A copy of the notice shall be handed to the operator or the operator's […]

§22-3-18. Approval, Denial, Revision and Prohibition of Permit

(a) Upon the receipt of a complete surface-mining application or significant revision or renewal thereof, including public notification and an opportunity for a public hearing, the director shall grant, require revision of, or deny the application for a permit within sixty days and notify the applicant in writing of the decision. The applicant for a […]

§22-3-19. Permit Revision and Renewal Requirements; Incidental Boundary Revisions; Requirements for Transfer; Assignment and Sale of Permit Rights; Operator Reassignment; and Procedures to Obtain Inactive Status

(a)(1) Any valid permit issued pursuant to this article carries with it the right of successive renewal upon expiration with respect to areas within the boundaries of the existing permit. The holders of the permit may apply for renewal and the renewal shall be issued: Provided, That on application for renewal, the burden is on […]

§22-3-2. Legislative Findings and Purpose; Jurisdiction Vested in Division of Environmental Protection; Authority of Secretary; Inter-Departmental Cooperation

(a) The Legislature finds that it is essential to the economic and social well-being of the citizens of the State of West Virginia to strike a careful balance between the protection of the environment and the economical mining of coal needed to meet energy requirements. (1) Further, the Legislature finds that there is great diversity […]

§22-3-21. Decision of Secretary on Permit Application; Hearing Thereon

(a) If an informal conference has been held, the secretary shall issue and furnish the applicant for a permit and persons who were parties to the informal conference with the written finding granting or denying the permit, in whole or in part, and stating the reasons therefor within sixty days of the informal conference, notwithstanding […]

§22-3-22. Designation of Areas Unsuitable for Surface Mining; Petition for Removal of Designation; Prohibition of Surface Mining on Certain Areas; Exceptions; Taxation of Minerals Underlying Land Designated Unsuitable

(a) The director shall establish a planning process to enable objective decisions based upon competent and scientifically sound data and information as to which, if any, land areas of this state are unsuitable for all or certain types of surface-mining operations pursuant to the standards set forth in subdivisions (1) and (2) of this subsection: […]

§22-3-22a. Blasting Restrictions; Site Specific Blasting Design Requirement

(a) For purposes of this section, the term "production blasting" means blasting that removes the overburden to expose underlying coal seams and does not include construction blasting. (b) For purposes of this section, the term "construction blasting" means blasting to develop haul roads, mine access roads, coal preparation plants, drainage structures or underground coal mine […]

§22-3-24. Water Rights and Replacement; Waiver of Replacement

(a) Nothing in this article affects in any way the rights of any person to enforce or protect, under applicable law, the person's interest in water resources affected by a surface mining operation. (b) Any operator shall replace the water supply of an owner of interest in real property who obtains all or part of […]