US Lawyer Database

Section 7966.

7966. In any tunnel classified as gassy by the division, there shall be tests for gas or vapors taken prior to each shift and at least hourly during actual operation. If a mechanical excavator is used, gas tests shall be made prior to removal of muck or material and before any cutting or drilling in […]